Solar Array Construction Excavating Company  Structure Excavation  Engineered Fill
Foundation Drilling Company  Drilled Shaft  Caisson  Casing  Drilling Bucket
Shoring  Sheet Pile  Beam & Plate  Sheet Pile Driver  Pile Vibro Vibebro Hammer
Back hoe Excavator Helical Piers

DARRYL MUELLER CONSTRUCTION INC. Excavating, Drilling, Helical Piers, Caisson, Shoring, Sheet Pile, Beam & Plate, Environmental Back hoe, Excavator, Concrete Breaking, Drilling, Caisson, Casing, Back fill & Compaction, Structure Excavation & Shoring.  Altamont Landowners Against Rural Mismanagement, GOLDEN EAGLE , BALD EAGLE, RAPTORS, ENDANGERED SPECIES ACT, RED TAIL HAWKS, PEREGRINE FALCONS, WINDMILLS, WINDTURBINES, WIND ENERGY, RENEWABLE ENERGY, ALTERNATIVE ENERGY, SOLAR ARRAY CONSTRUCTION

#1

FULL SERVICE
Excavating and Equipment Supplier

What do you need?  We have it!  43 years of experience you can count on 24 7.

1. LOCAL 3  owner operated equipment.
2. BACK HOES, we have the best union owner operators. 80
3. EXCAVATING, foundations, structure, underground and utilities.
    a. Excavators from zero tail swing up to 80 ,000 lb..
4. GRADING, slide repair, house pads, mass excavation and off haul.
5. HY-RAM, rock and concrete breaking.
6. DRILLING, 6" to 72" diameter, pile, foundations and trees.
    a. CAISSON drilling and driving.
    b. ROCK CORING.
    c. HORIZONTAL DRILLING under buildings.
    d. HELICAL PIERS.
7. PILE DRIVING, solder pile and sheeting, and shoring.
8. SOIL COMPACTION, structure, slope, trench with plate and sheep's foot wheel.
9. HAZARDOUS SUBSTANCE removal and remedial actions certification.
10. COMPETENT PERSON yes we have that to for excavating.
11. O.S.H.A., C.E.R.C.L.A., R.C.R.A., 40 hour safety training certification.
12. GENERAL Engineering License NO. 692284
13. HAZARDOUS Substances Removal and Remedial Actions Cert.
14. TRUCKS, end dumps , 10 wheelers and bobtails.
15. CERTIFIED PAYROLLS we can provide this when needed.
16. LAST; we don't slip any trainees in, you always get a well seasoned professional operating engineer.
 

Welcome to: Darryl Mueller Constructions Web Site.

To get equipment rates go to the rate page. CLICK HERE!


California Engineer Builder October 17, 2005 Front page, 6 & 7 Story about DARRYL

THE "WALL STREET JOURNAL" November 20, 2000 PAGE #1 story about DARRYL

San Francisco Chronicle Page #1 Story August 20, 1999 "Winds of Change "

Click on underlined words to move through site and see pictures, Quick time move or go to rate page!

Click on: DARRYL MUELLER CONSTRUCTION INC. and go to the equipment rate page.


Picture Gallery
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

PC 220 Driving 6 in beams for 1.1 MW  Largest PV project in the US built under customer enrollment, enXco Solar Array in Wilton for Premier Power of El Dorado Hills, CA 6/8/08

PC 150 Drilling 3 ft. by 35 ft. deep with bad access at Terra Nova H.S. Pacifica for KMA Concrete of San Jose, CA 6/7/08

PC 220 Drilling 5 ft. diamiter by 15 ft. in San francisco for Industrial Sign of San francisco 5/1/08

PC 150 Drilling 5 ft. diameter by 17 ft. deep for Carl's Junior in Atwater for United Sign System of Modesto 1/2/08

PC 150 Burying communication cables of cell site at San Miguel for LD Stroble of Concord 11/5/07

PC 220 Drilling 3 ft. diameter by 40 ft. deep for vertical drain field in Elk Grove for SEERS of Shingle Springs 10/29/07

PC 220 Drilling 5 ft. diameter by 22 ft. deep at McCarthy Business Park, Gilrory for United Sign System of Modesto 10/4/07

PC 220 Drilling 2 ft. diameter by 32 ft. and set 16-67 soldier pile in Walnut Creek for HGL Construction of Castro Valley 9/27/07

680 CASE Drilling 12 in. diameter for 2 new houses in Vacaville for Jim Loomis of Vacaville 8/27/07

PC 150  Drilling 12 in. by 20.5 ft. deep stitch piers and excavate basement in Menlo Park for PSI Concrete of San Jose 8/16/07

PC  150 Drilling 5 ft. diameter by 15.5 at new Hampton Inn & Suits in Merced for California Sign of Manteca 7/30/07

PC 150 Installing Sheet Pile Sea Wall at Burlingame Country Club for Aquatic Environments of Alamo 7/20/07

PC 150 Drilling 12 inch to 25 ft. for dewatering wells on sewer line replacement in Oakland for Andes Construction of Oakland 7/16/07

PC 220 Driving sheet pile for storm sewer main replacement in San Francisco for Granite Construction of  Watsonville 7/26/07

PC 220 Driving sheet pile new at Cisco Systems Campus at Santa Teresa Rd. San Jose for R.L. Harris of  Martinez 6/14/07

PC 150 Drilling 18 inch diameter by 22 ft. in Oakland for PSI Concrete of San Jose 5/23/07

PC 150 Drilling 16 inch diameter piers with water for house foundation at Castro Valley for T.C. Conde General Contractor of Hayward 3/20/07

PC 150 Drilling 5 ft. diameter  by 21.5 ft sign foundation at Khols Stockton along I 5 for United Sing Systems of Modesto 3/13/07

PC 220 Stripping to sub-grade road widening at Hedge & Jackson in Sacramento for CalTrans, Prism Engineering of San Jose 2/5/07

PC 150 Drilling 5 ft. diameter sign foundation at Star Bucks in Merced at Hwy 99 & Childs Rd. for United Sign System of Modesto 2/1/07

PC220 Driving 30 ft sheet pile for Kinder Morgan's jet fuel pipeline at San Francisco International Airport For Rockford Corp of Yuba City 1/2/07

PC 220 Driving sheet pile for a coffer dam for new bridge on Santa Teresa Rd. San Jose, for R.M. Harris of Martinez 9/22/06

PC 150 and 580 hoeram take a Bank wall down on a renovation in Gilroy, For PSI Concrete of San Jose  9/13/06

PC 220 Drilling 3 ft' diameter by 25 ft, Dry wells in Ceres for Teichert Const., of Turloc  8/31/06

PC 220 Drilling in cobble and setting 35 ft H-pile for 8' by 12' plates at Hwy 17, Campbell Av., CalTrans job for Pavex of San Jose 8/28/07

PC 220 Driving PZ 27 sheet pile at 580 & 101 in San Rafael, CalTrans job for R.M. Harris of Martinez  8/13/06

PC 220 Pre-Drilling for H-pile, Driving 5x15 ft. plates to shore 15'8" by 37'4" 17' deep at Penkie Leaseing Santa Clara, for Tank Specialist of Corona, CA 6/14/06

PC 220 Drilling 16 inch to 24 ft. in Hayward 5/25/06

PC 150 doing Geo-tech slide and fault investigations at Skyline Blvd., Oakland for Kleinfelter Inc. 5/23/06

PC 220 Excavating and Drilling for new foundations in Castro Valley for California Builders Inc.  5/19/06

PC 150 Drilling 5 Foot Diameter for a sanitary lift station at new Target at Hayward, CA for Aquaduct Plumbing of Hayward 3/23/06

Drilling for Creek Side Landcape at Woodside, CA for PSI Concrete of Santa Clara 3/21/06

PC 150 Drilling 32 ft. 24 inch CIDH, to stabilize bank at Silver Creek San Jose, CA for Rick Bernetti Dev. Inc of Pleasanton 3/13/06

PC 150 Drilling 5 ft. diameter CIDH, signs at Promende at Natomas, Sacramento for Calif. Pacific Neon Products of San Diego 12/12/05

PC 150 Reaching 54 feet installing Helical Piers for new dock at 5 Star Marina Stockton 11/16/05

PC 220 LLC Drilling, Setting Beams, Plates, and Driving at Los Positas Collage, Livermore for Sierra Bay Contractors. 11/2/05

PC 220 LLC Long reach and PC 150 Drilling rig for Casey Fogli of Hayward at Qualcom for Devel Const. at San Jose 8/24/05

PC 220 LLC Long reach and PC 150 Drilling rig for Casey Fogli Concrete of Hayward at Qualcom for Devel Const. at San Jose 8/24/05

PC 220 LLC Long reach putting rock in after excavating for Casey Fogli of Hayward at Qualcom for Devel Const. at San Jose 8/24/05

PC 220 LLC Excavating turn lane in for Prism Engineering at Hayward 8/27/05
PC 220 LLC Loading trucks at Richmond 6/6/05

PC 150 Rock excavating for road and house pad at Almaden, San Jose 5/20/05

PC 150 Drilling for addition in Orinda for Tom Lutz Const. of Pleasanton 10/22/04

PC 220 LLC drilling 6 foot diameter CIDER for IKEA sign for AdArt Sign of Stockton 10/18/04

Slope repair and house pad  grading for Roberts at Moraga 10/1/04

PC 150 drilling house foundation in Silver Creek for David Jackson of Gilrory 11/13/04

PC 150 drilling piers in Almaden for PSI Concrete of San Jose 8/5/04

PC 220 drilling 6 foot diameter CIDH in Byron for TCB Industrial 7/30/04

680 L CASE drilling 4 foot diameter pier for signal light in Dublin for Winguard Engineering of Bethel Island 6/3/04

PC 150 Loading toolies into grinder at Santa Cruz for Aquatic Environment of Alamo 5/26/04

PC 220 LLC Drilling 3 each 4 foot diameter CIDH for new a Target sign at San Leandro for Floresco Sign 3/3/04

PC 220 LLC Excavating basement in Silver Creek for David Jackson of Gilroy 2/12/04

PC 150 Remove house in Saratoga for Viviana 11/24/03

PC 220 LLC with 60 inch bucket, loading trucks at Concord, for Conco Cement of Concord 12/5/02

PC 150 with 18 inch drill, reaching down 15+ ft. & drilling 28+ ft. in CastroValley, 11/25/02

PC 220 with 60 inch bucket structure excavating at Emervville, for Conco Cement of Concord 10/28/02

PC 150 excavating, drilling and loading trucks at Saratoga, for Schiffman of Saratoga 7-8/02

PC 150 with 16 inch reach drilling Saratoga for PSI Concrete of San Jose 6/20/02

PC 150 lazier excavating pond site at Saint Helena of Aquatic Environment of Alamo 6/12/02

PC 150 shoring and excavating structure at Santa Clara County building for Nunas Concrete of San Jose 6/4/02

PC 220 LLC with 48 in. bucket structure excavation at UC Santa Cruz for Urata & Sons of Rancho Cordova 3/21/02

PC 220 LLC with pile driver extractor pulling sheets in Foster City for Anderson Pacific of Santa Clara 3/13/02

PC 150 60 in. bucket loading muck at Redwood City, for Aquatic Environment of Alamo 2/1/02

PC 150 with ripper, de-compacting at Santa Clara Water Dist. San Jose for Cohen Landscape, San Jose 1/8/02

PC 150 with 24 in. drill reach drilling off levy, Santa Clara Water Dist. San Jose for Cohen Landscape, San Jose 1/15/02

PC150 with pile driver extractor pulling sheets in Foster City for Anderson Pacific of Santa Clara 10/17/01

PC 150 with 18 in. drill reaching and drilling 22 ft. in rock, Alamo for Tom Lutz Const of Pleasanton 10/15/01

Slope Repair at Bay View for Oakland for Zcon of Oakland 9/18/01

PC 150 with 12 in. drill reaching 27ft. and drilling 8 to 15 ft. in rock, Castro Valley for Schan Crump's Residence 8/31/01

PC 220 with 30 drill putting in shoring, 14 / 89 X 25 ft. beams and 5 by 15 ft. plates for Buddy's Contracting, Visalia, for The Buro for Reclamation at San Justo Dam, Hollister 8/27/01

PC 150 with drill & drilling 48 inch caissons 16 foot deep at Delta Energy Center in Pittsburg for Contra Costa Electric 7/16/01

PC 150 with drill & long reach drilling 24" caissons 32 feet deep at new PacBell building in Fremont for Urata & Sons 4/11/01

PC 220 LLC with pile driver extractor removing shoring at Channing Place, Palo Alto for Anderson Pacific of Santa Clara 4/16/01

PC 220 LLC  with drill & long reach 3rd member jib at yard.

PC 150 with drill & long reach 3rd member jib extention at Silver Creek, San Jose for TurnKey Const. of Gilroy 1/31/01

PC 220 LLC with 3rd member & 60 in. bucket parked

PC 220 LLC with 3rd member & 60 in. bucket 51 ft. of reach with extensions to 70 ft.

PC 150 with 60 in. bucket loading Alltrack at Rossmore Golf Course for Aquatic Environments, Alamo 12/22/99

PC 150 with 22 in. drill at Valley Christian H.S., San Jose for Urata & Sons Cement Inc., Ranch Cordova 7/1/99

PC 150 with 5 ft. drill at McCarthy Ranch, Milpetas for AdArt Electric Signs, Stockton 12/15/99

PC 150 with drill & long reach 3rd member extension in Woodside, for PSI Concrete of San Jose 12/17/99

PC 150 structure excavation People Soft Pleasanton, for Conco Cement of Concord 12/22/99
Hot Links

Go to: Altamont Landowners Against Rural Mismanagement  enviromental web site

The ENVIROMENTAL WORLD WIDE WEB SITE located at THE ALTAMONT PASS, ALAMEDA COUNTY, LIVERMORE, CALIFORNIA .
The Altamont Pass has the densest population of nesting GOLDEN EAGLES in the world. Why would so called enviromentalis protect windmills instead of Eagles?

Eagles, Raptors and birds of all types are being killed by the so called renewable benighclean energy. California's Energy crisis can be traced to developing high cost renewables
and ignoring the need for conventional power sources. The lead agency responsible is The California Energy Comission.

If you have comments or suggestions, email me at dmc@darrylmueller.com


This page created with Netscape Navigator Gold