150 Drilling new
sign
foundation
5 ft. by 20 ft. at The
Holiday Inn Express in Merced for Swain Sign of Ontario, 10/6/09
PC
150 Rock Drilling
for new house foundation at Los Altos for Alfrados Concrete Union City,
10/5/09
PC 220 Mowing and Raking
Toolies to clean drainage channels at Sunnyvale for Aquatic
Environments of Alamo, CA 10/10/09
Case
680L Drilling for temporary power poles for traffic control Sky
Londa Highway 84 for Bettencourt Bros. Livermore 9/26/09
Case
680L Drilling for temporary power poles for traffic control Highway
1 Mill Valley for Bettencourt Bros. Livermore 9/2/09
PC
220 Driving 8 inch beams for Solar
Array for enXco in Wilton for Spectrum Energy of Elk Grove 7/22/09
PC
220 Drilling foundations for new grandstands Capuchino
High School, San
Bruno for Steel Stadiums of Graham, Texas 6/26/09
PC
220 Excavating for Earthquake Fault
Study & Pier Review at Union City for Treadwell & Rollo of San
Jose 5/26/09
PC
150 Drilling and Bobcat 442 Drilling a new house addition with tight
access in Mill Valley 3/6/09
PC 150 pulling 35 ft. beams and 8 by 12 plates at Golden Gate Presbyterian
Church in
Daily City for 80 West of Vallejo 12/2/08
PC
220 Drilling 40 ft. deep foundation piers in San Mateo for new
house foundations for Conco Cement of Concord 11/11 /08
PC
220 Driving 20 ft. sheet pile for sewer replacement in San
Francisco for Granite Const. of Watsonville 11/10/08
PC
150 Excavation for at Wastewater Treatment Plant Milpitas for
Anderson Pacific of Santa Clara 11/8/08
PC
150 Drilling 18 inch by 20 ft. in Hillsborough for new retaining
walls
for PSI Concrete of Santa Clara 10/21/08
PC
220 Driving PZ27 30 ft. in Milpitas for relocation of vaults for
J. Fletcher Creamer of Hackensack, N.J. 10/6/08
PC
220 Drilling 2. 6 ft. dia. by 27 ft. deep at a new Kohl's sign in
Chowchilla for United Sign Systems of Modesto 8/26/08
PC
220 Driving
6 in beams for
1.1 MW Largest PV
project in the US built under customer enrollment, enXco Solar Array in Wilton for Premier
Power
of
El
Dorado
Hills,
CA 6/8/08
PC
150 Drilling 3 ft. by 35 ft. deep with
bad access at Terra Nova H.S. Pacifica for
KMA
Concrete of San Jose, CA 6/7/08
PC
150 Drilling 21.5 by 42 inch casson for in Concord for LD Stroble,
4/21/08
PC
220 Driving Sheet Pile street crossing in San Francisco for Granite
Construction of Watsonville, 4/18/08
PC
220 Drilling 5 ft. diameter by 15 ft. in San francisco for
Industrial Signs of San Francisco 5/1/08
PC 150 Drilling 5 ft. diameter by 17 ft. deep
for Carl's Junior in Atwater for United Sign Systems of Modesto 1/2/08
PC 150 Burying
communication cables of cell
site at San Miguel for LD Stroble of Concord 11/5/07
PC 220 Drilling 3 ft. diameter by 40 ft. deep
for vertical drain field in Elk Grove for SEERS of Shingle Springs
10/29/07
PC 220 Drilling 5 ft. diameter by 22 ft. deep
at McCarthy Business Park, Gilroy for United Sign Systems of Modesto
10/4/07
PC
220 Drilling 2 ft. diameter by 32 ft. and set 16-67 soldier pile in
Walnut Creek for HGL Construction of Castro Valley 9/27/07
680 CASE Drilling 12 in. diameter for 2 new
houses in Vacaville for Jim Loomis of Vacaville 8/27/07
PC 150 Drilling 12 in. by 20.5 ft. deep
stitch piers and excavate basement in Menlo Park for PSI Concrete of
San Jose 8/16/07
PC 150 Drilling 5 ft. diameter by 15.5
at new Hampton Inn & Suits in Merced for California Sign of Manteca
7/30/07
PC
150 Installing Sheet Pile Sea Wall at
Burlingame Country Club for Aquatic Environments of Alamo 7/20/07
PC 150 Drilling 12 inch to 25 ft. for
dewatering wells on sewer line replacement in Oakland for Andes
Construction of Oakland 7/16/07
PC
220 Driving sheet pile for storm
sewer
main replacement in San Francisco for Granite Construction of
Watsonville 7/26/07
PC
220 Driving sheet pile new at Cisco Systems Campus at Santa Teresa
Rd. San Jose for R.M. Harris of Martinez 6/14/07
PC 150 Drilling 18 inch diameter by 22 ft. in
Oakland for PSI Concrete of San Jose 5/23/07
PC 150 Drilling 16 inch diameter piers with
water for house foundation at Castro Valley for T.C. Conde General
Contractor of Hayward 3/20/07
PC 150 Drilling 5 ft. diameter by 21.5
ft sign foundation at Kohl's Stockton along Hwy I-5 for United Sign
Systems
of Modesto 3/13/07
PC 220 Stripping to sub-grade road widening
at
Hedge & Jackson in Sacramento for CalTrans, Prism Engineering of
San Jose 2/5/07
PC 150 Drilling 5 ft. diameter sign
foundation at Star Bucks in Merced at Hwy 99 & Childs Rd. for
United
Sign Systems of Modesto 2/1/07
PC220 Driving 30 ft sheet pile for Kinder
Morgan's jet fuel pipeline at San
Francisco International Airport For Rockford Corp of Yuba City 1/2/07
PC 220 Driving sheet pile
for a coffer dam
for new bridge on Santa Teresa Rd. San Jose, for R.M. Harris of
Martinez
9/22/06
PC 150 and 580 hoeram take a bank wall down
on a renovation in Gilroy, for PSI Concrete of San Jose 9/13/06
PC 220
Drilling 3 ft. diameter by 25 ft. Dry wells in Ceres for Teichert
Const., of Turloc 8/31/06
PC 220 Drilling in cobble and setting 35 f.
H-pile for 8' by 12' plates at Hwy 17, Campbell Ave., CalTrans job for
Pavex of San Jose 8/28/07
PC 220 Driving PZ 27 sheet pile at Hwys 580
&
101 in San Rafael, CalTrans job for R.M. Harris of Martinez
8/13/06
PC 220 Pre-Drilling for H-pile, Driving 5x15 ft. plates to shore 15'8" by 37'4" 17' deep at Penkie Leasing
Santa Clara, for Tank Specialist of Corona, CA 6/14/06
PC 220 Drilling 16 inch to 24 ft. in Hayward
5/25/06
PC 150 doing Geo-tech slide and fault
investigations at Skyline Blvd.,
Oakland for Kleinfelder
Inc. 5/23/06
PC 220 Excavating and Drilling
for new foundations in Castro Valley for California Builders Inc.
5/19/06
PC 150 Drilling 5 Foot Diameter for a
sanitary lift station at new Target at Hayward, CA for Aquaduct
Plumbing of Hayward 3/23/06
Drilling for Creek Side Landscape at
Woodside,
CA for PSI Concrete of Santa Clara 3/21/06
PC 150 Drilling 32
ft. 24 inch CIDH, to stabilize bank at
Silver Creek San Jose, CA for Rick Brunetti Dev. Inc. of Pleasanton
3/13/06
PC 150 Drilling
5 ft. diameter CIDH, signs at Promenade at Natomas, Sacramento for
Calif.
Pacific Neon Products of San Diego 12/12/05
PC 150 Reaching 54 feet installing Helical Piers for
new
dock at 5 Star Marina Stockton 11/16/05
PC 220 LLC Drilling,
Setting Beams, Plates,
and
Driving at Las Positas College,
Livermore for Sierra Bay Contractors. 11/2/05
PC 220 LLC Long reach and PC 150 Drilling rig
for Casey Fogli of Hayward at
Qualcom for Devel Const. at San Jose 8/24/05
PC 220 LLC Long reach and PC 150 Drilling rig
for Casey Fogli Concrete of Hayward at
Qualcom for Devel Const. at San Jose 8/24/05
PC 220 LLC Long reach putting rock in after
excavating
for Casey Fogli of Hayward at Qualcom for Devel Const. at San Jose
8/24/05
PC 220 LLC Excavating
turn lane in for Prism
Engineering
at Hayward 8/27/05
PC 220 LLC
Loading
trucks at Richmond
6/6/05
PC 150 Rock excavating for road
and
house pad at Almaden, San Jose 5/20/05
PC
150 Drilling
for
addition in Orinda for Tom Lutz Const. of Pleasanton 10/22/04
PC
220
LLC
drilling
6
foot diameter CIDER for IKEA sign for AdArt Signs of Stockton
10/18/04
Slope
repair
and
house
pad grading for
Roberts
at Moraga 10/1/04
PC
150
drilling
house
foundation in Silver Creek for David Jackson of Gilrory 11/13/04
PC
150 drilling
piers
in Almaden for PSI Concrete of San Jose 8/5/04
PC
220 drilling
6
foot diameter CIDH in Byron for TCB Industrial 7/30/04
680 L
CASE
drilling
4 foot diameter pier for signal light in Dublin for Winguard
Engineering of Bethel Island 6/3/04
PC
150
Loading
toolies into grinder at Santa Cruz for Aquatic Environment of Alamo
5/26/04
PC
220 LLC Drilling
3 each 4 foot diameter CIDH for new a Target sign at San Leandro for
Floresco
Sign 3/3/04
PC 220 LLC
Excavating
basement in Silver Creek for David Jackson of Gilroy 2/12/04
PC 150 Remove
house in Saratoga for Viviana 11/24/03
PC 220 LLC with 60 inch bucket, loading
trucks
at Concord, for Conco Cement of Concord 12/5/02
PC
150 with 18 inch
drill,
reaching down 15+ ft. & drilling 28+ ft. in Castro Valley,
11/25/02
PC
220 with 60 inch
bucket
structure excavating at Emeryville, for Conco Cement of Concord 10/28/02
PC 150
excavating,
drilling
and loading trucks at Saratoga, for Schiffman of Saratoga 7-8/02
PC 150
with 16 inch reach
drilling
Saratoga for PSI Concrete of San Jose 6/20/02
PC 150
lazier excavating
pond
site at Saint Helena of Aquatic Environment of Alamo 6/12/02
PC 150
shoring and excavating
structure at Santa Clara County building for Nunas Concrete of San Jose
6/4/02
PC 220
LLC with 48 in. bucket
structure excavation at UC Santa Cruz for Urata & Sons of Rancho
Cordova
3/21/02
PC 220
LLC with pile
driver extractor pulling sheets in Foster City for Anderson Pacific
of Santa Clara
3/13/02
PC 150 60 in.
bucket
loading
muck at Redwood City, for Aquatic Environment of Alamo 2/1/02
PC 150
with ripper,
de-compacting
at Santa Clara Water Dist. San Jose for Cohen Landscape, San Jose 1/8/02
PC 150
with 24 in.
drill
reach drilling off levy, Santa Clara Water Dist. San Jose for Cohen
Landscape,
San Jose 1/15/02
PC
150
with pile driver
extractor pulling sheets in Foster City for Anderson Pacific of Santa
Clara
10/17/01
PC 150 with
18 in. drill
reaching
and drilling 22 ft. in rock, Alamo for Tom Lutz Const of Pleasanton
10/15/01
Slope Repair
at Bay View for
Oakland
for Zcon of Oakland 9/18/01
PC
150 with 12 in. drill
reaching 27 ft. and drilling 8 to 15 ft. in rock, Castro Valley for
Schan Crump's
Residence 8/31/01
PC 220
with 30 drill
putting
in shoring, 14 / 89 X 25 ft. beams and 5 by 15 ft. plates for Buddy's
Contracting,
Visalia, for The Bureau for Reclamation at San Justo Dam, Hollister
8/27/01
PC 150 with
drill &
drilling 48 inch caissons 16 foot deep at Delta Energy Center in
Pittsburg for Contra
Costa Electric 7/16/01
PC
150
with drill & long reach drilling 24" caissons 32 feet deep at
new
PacBell
building in Fremont for Urata & Sons 4/11/01
PC
220 LLC with pile
driver
extractor removing shoring at Channing Place, Palo Alto for Anderson
Pacific
of Santa Clara 4/16/01
PC
220
LLC
with
drill
&
long reach 3rd member jib at yard.
PC
150
with
drill
&
long
reach
3rd
member jib extension at Silver Creek, San Jose for TurnKey Const. of
Gilroy 1/31/01
PC
220
LLC with 3rd member & 60 in. bucket parked
PC 220
LLC with 3rd
member
& 60 in. bucket 51 ft. of reach with extensions to 70 ft.
PC 150
with 60 in. bucket
loading
All track at Rossmore Golf Course for Aquatic Environment, Alamo
12/22/99
PC 150 with 22
in. drill at
Valley
Christian H.S., San Jose for Urata & Sons Cement Inc., Ranch
Cordova
7/1/99
PC 150 with
5 ft. drill
at
McCarthy Ranch, Milpitas for AdArt Electric Signs, Stockton 12/15/99
PC 150
with drill &
long
reach 3rd member extension in Woodside, for PSI Concrete of San
Jose
12/17/99
PC 150
structure excavation
People Soft Pleasanton, for Conco Cement of Concord 12/22/99
Go to Home